QuorumCivic. Hidden in plain sight Get the app
Bill intelligence

H.R. 9777, Utility Cost-Shifting Mandate. Quorum's AI analysis reads it as a trade-off: gains for some, costs for others.

H.R. 9777 · Mixed

1 riderRenewable Energy

What it does

This bill requires all data centers with 5+ megawatts of power demand to generate their own electricity and water entirely off-grid—no connection to the public electric grid or municipal water systems allowed. Existing data centers have 180 days to comply; new ones must comply from day one. The bill also grants legal force to a March 2026 presidential proclamation titled 'Ratepayer Protection Pledge.'

The analysis names renewable energy equipment manufacturers (solar, wind, battery systems) — and 3 more groups — among the beneficiaries.

The trade-off

The bill does not define 'captive power plant' or 'on-site power generation' standards, leaving ambiguity about what sources qualify (solar, wind, nuclear, fossil fuels all potentially allowed).

Transparency scores 55%. The analysis flags 1 rider and a high warning level.

Who is behind it

Filed by Byron Donalds.

Correlative observation from public records — not evidence of coordination or wrongdoing, and not financial advice.
This page is the record as of today. The app tells you when it changes.
SOURCE: QUORUM BILL ANALYSIS (LLM, FULL TEXT) · QUORUM BILL TRANSPARENCY ANALYSIS